Factsheet of the Sopladora Project
Technical Data of the Sopladora Project
DESCRIPTION
|
VALUES |
| 1. HYDROLOGY |
| 1.1 Hydrographic watershed effluents to the Amaluza Reservoir |
5 060 km2 |
| 1.2 Multiannual average flow of the feeder of Amaluza Reservoir |
118,9 m3/s |
| 1.3 Natural growing at the site of the Amaluza Dam |
| Frequencies: |
CMP |
7 720 m3/s |
| 1000 years : |
3 320 m3/s |
| 100 years : |
2 450 m3/s |
| 50 years : |
2 200 m3/s |
| 25 years: |
1 930 m3/s |
| 10 years: |
1 580 m3/s |
| 5 years: |
1 300 m3/s |
| 1.4 Influx of sediments to the Amaluza Reservoir |
|
- Without Mazar Reservoir |
2,98 hm3/año |
| - With Mazar Reservoir |
0,88 hm3/año |
| 2. LEVELS (m. s. l.) |
| 2.1 Interconnection Chamber |
|
Maximum maximorum: |
1 318,14 |
| Normal Maximum |
1 315,40 |
| Normal: |
1 314,07 |
| Minimum: |
1 303,05 |
| 2.2 Distributor Shaft and Francis turbine runner |
916,00 |
| 2.3 Maximum water level at discharge |
928,55 |
| 2.4 Solera of the portal of the discharge tunnel |
922,00 |
| 2.5 Levels of the Paute River at discharge |
|
Maximum (1:1000 years) : Normal : |
932,80 |
| Normal : |
922,00 |
DESCRIPTION
|
VALUES |
3. CHARGING SYSTEM |
3.1 Underground Direct Connection Molino - Sopladora
|
Disposition: Tunnel of connection to free flow, from the discharge tunnel of Molino up to the interconnection chamber
|
Water-dumps Control: Molino Discharge
|
|
Length (each water dump)
|
6.67 m
|
Crest Level Phase AB
|
1315,25 msnm
|
Crest Level Phase C
|
1315,40 msnm
|
Intermediate Discharge:
|
|
Length
|
14,00m
|
| Crest Level |
1315,40 msnm
|
Connection Tunnel between the discharge tunnels of Molino Central
|
|
Length
|
37,88m
|
Cross Section (Width to Height) Trunk
|
6,67 x 11,70 m
|
Sub grade
|
1308,80 msnm
|
Connection Tunnel to the inter-connection chamber
|
|
Length
|
95,12 m
|
Cross Section (Width to Height) Trunk
|
7,0 x 11,70 m
|
Longitudinal slope
|
0,115 %
|
| Extreme sub grade downstream end |
1308,70 msnm |
Inter-connection Chamber
|
|
Length
|
125 m
|
Cross Section (Average Width to Height)
|
14 m x 19,2 m
|
Sub Grade
|
1302, a 1297,00 msnm |
|
Inter connection Well
|
| Layout: Vertical shaft between the inter-connection chamber and the upper cargo tunnel |
Straight Section Height
|
21,78 m
|
Useful Diameter
|
6,70 m
|
| Elbow (Angle/ratio/length) |
89,83º/15,00 m/ 23,52 m |
DESCRIPTION
|
VALUES |
3.2 SUPERIOR CONDUCTION OF CHARGE |
Total length of the conduction including the interconnection well
|
4825,14 m
|
Total length in the tunnel
|
4679,80 m
|
Tunnel construction window
|
|
Length construction window 1
|
322,96 m
|
Length construction window 2
|
288,50 m
|
Excavation main section
|
|
Type
|
Modified horseshoe
|
Diameter
|
7,60 m
|
| Coating |
|
minimum
|
Concrete hearth 0,20 m
|
| Maximum |
Circular, Conventional concrete 0,35 m
|
Paute River crossing
|
|
Disposition: Sub fluvial Step. Tunnel under the Paute River including a section with steel plating embedded in concrete
|
Shielding Length
|
100 m
|
Diameter of shield
|
5,2 m |
Sub-grades (m. s. l.) :
|
in the interconnection well (abscissa K0 + 014,94)
|
1262,46 |
In sub fluvial step
|
1261,50
|
in connection with the window 1
|
1260,23 |
| in connection with the window 2 |
1263,92 |
| At the end of the loading tunnel |
1264,56 |
Slopes :
|
Interconnection well to sub fluvial crossing
|
0,30 %
|
Sub fluvial step to window 1
|
0,30 %
|
Window 1 to PIV (counter slope)
|
0,80 %
|
| PIV to window 2 |
0,35 % |
| window 2 to loading well (counter slope) |
0,50 % |
DESCRIPTION
|
VALUES |
| Windows of Construction 1 and 2: |
Window 1 Window 2 |
Section (width and Height) trunk type
|
6m x 6m 6,5 m x 7,15 m
|
Lenght 1 and 2
|
322,96m 288,50m
|
| Longitudinal Slope windows 1 and 2 |
5,49% 0,50%
|
| Sub Grade in portal (m. s. l.) windows 1 and 2 |
1275,80 1262,48 |
3.3 Chimney of Balance
|
|
Disposition: Vertical Well with strangulation hole and an upper gallery.
|
322,96 m
|
Chimney Well
|
|
Distance from chimney connection up to the axis of the loading well.
|
15 m
|
Height
|
55,32 m
|
Diameter excavated
|
9,90m
|
Upper Chamber
|
|
Trunk Type Section (width x height)
|
8,90 m x 8,90m
|
Total Length
|
170,24 m m
|
| Sub grade (m. s. l) |
1329,80 / 1312,80
|
Longitudinal slope inclined section
|
12,85 %
|
3.4 Gravel Trap
|
|
| Distance from the chimney of balance |
83,21 |
| Disposition: Rectangular Chamber under the sub grade of the loading upper tunnel, with 4 cells separated by transverse walls |
Dimensions:
|
Lenght x Width x Depth
|
6,70m x 20,00m x 2,0 m
|
En paso subfluvial
|
268 m3
|
DESCRIPTION
|
VALUES |
3.5 Loading Well
|
Coated with concrete Armored
|
Length
|
301,85 m 65,59 m
|
Excavation Diameter
|
7,30 m 6,20%
|
Inside Diameter
|
6,10 m 4,70 m
|
| Radio elbow (top) |
15,0 m 13,50 m |
| Shield Thickness |
52 mm |
| Stiffeners Rings: |
|
| Ring thickness |
30 mm |
| Height of the ring |
330 mm |
3.6 Charging Lower Tunnel
|
|
Disposition: Steel Armor (smooth pipe) embedded in concrete
|
|
Excavation section type
|
Modified horseshoe
|
|
Excavation Diameter
|
6,40 m
|
Interior Diameter
|
4,70m
|
Total length
|
98,63 m
|
Excavation slope
|
1,0% a 0%m
|
| Stiffener Rings: |
|
thickness of the ring
|
30 mm
|
Ring height
|
300 mm
|
3.7 Distributor and Banches
|
|
Excavation Section Type
|
Modified Horseshoe
|
Excavation Diameter
|
4,70
|
| Interior Diameter |
3,80 m
|
| Lenght |
23,05 m
|
| Shield Thickness |
52 mm
|
| Stiffener Rings: |
|
| Thickness of the ring |
20 mm
|
| Ring Height |
220 mm |
| Branches of each turbine: |
|
| Number |
3 unid |
| Excavation Diameter |
4,50 m |
| Interior Diameter |
2,90 m |
| Lenght of the branches |
54,35 m, 38,79 m 45,76 m
|
| Shield Thickness |
52 mm |
DESCRIPTION
|
VALUES |
4. CENTRAL UNDERGROUND
|
|
| 4.1 Access Tunnel |
|
Distance to Powerhouse
|
1923,92 m
|
Maximum Slope
|
10,51 %
|
Useful section
|
|
| Type |
Baúl
|
Dimensions (Width x height)
|
7,1m x 7,10 m
|
Sub grade (m. s. l.)
|
|
Portal
|
1125,40 |
Cavern Connection
|
929,30
|
4.2 Machines Cavern
|
|
| Width |
21,00 m |
Maximum Height (Including turbines wells)
|
45,53 m
|
|
Length
|
87,00 m
|
| Turbines |
|
Type
|
Francis
|
Number
|
3
|
| Nominal Flow |
50m3/s c/u |
| Nominal Fall |
359,00 m |
| Nominal Power (rated) |
163,28 MW |
| Nominal Speed |
360 rpm |
| Altitude of the impellers (m. s. l.) |
916,00 |
| Valves |
|
| Type |
Spherical |
| Number |
3 |
| Diameter |
2,80 m |
| Generators |
|
| Number |
3 |
| Nominal Apparent Power |
180,67 m |
| Synchronic Speed |
360 rpm |
| Voltage Generation |
13,8 Kv |
| Frequency |
60 Hz |
| Bridge - Cranes |
|
| Number |
2 |
| Light |
21 m |
| Capacity |
2x 200 t |
DESCRIPCIÓN
|
VALORES |
4.3 CAVERNA DE TRANSFORMADORES
|
|
Ancho
|
13,70 m
|
Altura
|
14,20 m
|
| Longitud |
101,20 m |
Patio de maniobras (área de 80,00 x 37,65 m)
|
|
| Ancho |
37,65 m
|
Longitud
|
80,0 m
|
Edificio del GIS
|
|
Ancho
|
15,00 m
|
Altura
|
6,50 m
|
| Longitud |
27,40 m |
Edificio de Servicios
|
|
Ancho
|
15,00 m
|
Altura (dos plantas)
|
9,00 m
|
Longitud
|
20,17 m
|
Galería de barras
|
|
| Número |
2 |
| Longitud |
40m c/u |
Dimensiones (ancho x alto)
|
|
| Galería de barras 1 |
4,00 x 6,90 a 5,80 m |
| Galería de barras 2 |
5,00 x 6,90 a 5,80 m
|
Barraje de generador
|
|
| Longitud |
|
| Capacidad |
|
| Enfriamiento |
|
DESCRIPCIÓN
|
VALORES |
4.4 GALERÍA Y POZO DE CABLES XLPE - 230 KV
|
|
Descripción: Galería con tramo inclinado pendiente 4,23% con ascensor en el pozo de cables
|
|
Galeria de cables:
|
14,20 m
|
Longitud Total
|
101,20 m |
| Dimensiones |
|
Patio de maniobras (área de 80,00 x 37,65 m)
|
|
| Ancho |
37,65 m
|
Longitud
|
80,0 m
|
Edificio del GIS
|
|
Ancho
|
15,00 m
|
Altura
|
6,50 m
|
| Longitud |
27,40 m |
Edificio de Servicios
|
|
Ancho
|
15,00 m
|
Altura (dos plantas)
|
9,00 m
|
Longitud
|
20,17 m
|
Galería de barras
|
|
| Número |
2 |
| Longitud |
40m c/u |
Dimensiones (ancho x alto)
|
|
| Galería de barras 1 |
4,00 x 6,90 a 5,80 m |
| Galería de barras 2 |
5,00 x 6,90 a 5,80 m
|
Barraje de generador
|
|
| Longitud |
|
| Capacidad |
|
| Enfriamiento |
|
DESCRIPTION